Solid waste project
Number:
Processing scale: 100t/d
Leachate treatment process: water quality balance + external MBR + nanofiltration / reverse osmosis
Leachate treatment process: water quality balance + external MBR + nanofiltration / reverse osmosis
Number:
Number of views:
1000
Keywords:
Number:
Processing scale: 700t/d
Leachate treatment process: MBR+RO (reverse osmosis) process
Leachate treatment process: MBR+RO (reverse osmosis) process
Number:
Number of views:
1000
Keywords:
Number:
Project Name: Phase I Project of Jinjie Industrial Park (General) Solid Waste Landfill Project in Shenmu County
Project scale: Jinjie Landfill covers an area of 333,654 square meters (500.48 mu), with a total storage capacity of 3,795,000 cubic meters. The average daily solid waste treatment in the first phase is 480 tons, with a storage capacity of 2,356,600 cubic meters. The first phase of domestic waste landfill area It is planned to be used for 13 years, the first-phase coal ash and slag landfill area is planned to be used for 12 years, and the general industrial waste landfill area is planned to be used for 15 years; the daily solid waste reception volume is set according to the original contract, and the leachate designed to be produced and treated is in the near future. 100 tons/day, and the long-term increase to 200 tons/day.
Treatment process: The sanitary landfill process is used for living, and the leachate adopts the process combination of low energy consumption evaporation (MVC) + ion exchange + ammonia recovery.
Project scale: Jinjie Landfill covers an area of 333,654 square meters (500.48 mu), with a total storage capacity of 3,795,000 cubic meters. The average daily solid waste treatment in the first phase is 480 tons, with a storage capacity of 2,356,600 cubic meters. The first phase of domestic waste landfill area It is planned to be used for 13 years, the first-phase coal ash and slag landfill area is planned to be used for 12 years, and the general industrial waste landfill area is planned to be used for 15 years; the daily solid waste reception volume is set according to the original contract, and the leachate designed to be produced and treated is in the near future. 100 tons/day, and the long-term increase to 200 tons/day.
Treatment process: The sanitary landfill process is used for living, and the leachate adopts the process combination of low energy consumption evaporation (MVC) + ion exchange + ammonia recovery.
Number:
Number of views:
1000
Keywords:
Number:
Project Name: Shixing County Domestic Waste Sanitary Landfill Project
Project scale: The total storage capacity is 2.0119 million cubic meters, and the average landfill waste volume is 60-120 tons/day. The designed leachate produced and treated is 50 tons/day in the near future, and will increase to 100 tons/day in the long term.
Treatment process: The sanitary landfill process is used for living, and the leachate adopts the process combination of low energy consumption evaporation (MVC) + ion exchange + ammonia recovery.
Project scale: The total storage capacity is 2.0119 million cubic meters, and the average landfill waste volume is 60-120 tons/day. The designed leachate produced and treated is 50 tons/day in the near future, and will increase to 100 tons/day in the long term.
Treatment process: The sanitary landfill process is used for living, and the leachate adopts the process combination of low energy consumption evaporation (MVC) + ion exchange + ammonia recovery.
Number:
Number of views:
1000
Keywords:
Number:
Project Name: Shenmu County Ningtiaota Industrial Park (General) Solid Waste Landfill Project
Scale of the project: The landfill has a total land use of 82,858m2 and a total storage capacity of 612,900m3. The site is divided into two different areas from the nature of use, namely: domestic waste landfill area and general industrial waste landfill area. The storage capacity of domestic waste landfill is 151,300 m3; the storage capacity of general industrial waste landfill area is 461,600 m3. The landfill volume is 301.2t/d.
Treatment process: The solid waste adopts the sanitary landfill process, and the leachate adopts the combination of adjustment tank + sand filtration + DTRO process.
Scale of the project: The landfill has a total land use of 82,858m2 and a total storage capacity of 612,900m3. The site is divided into two different areas from the nature of use, namely: domestic waste landfill area and general industrial waste landfill area. The storage capacity of domestic waste landfill is 151,300 m3; the storage capacity of general industrial waste landfill area is 461,600 m3. The landfill volume is 301.2t/d.
Treatment process: The solid waste adopts the sanitary landfill process, and the leachate adopts the combination of adjustment tank + sand filtration + DTRO process.
Number:
Number of views:
1000
Keywords:
Number:
Project Name: Food Waste Treatment Project in Shangzhou District, Shangluo City
Project scale: The processing capacity of kitchen waste is 30t/d.
Project technology: The kitchen waste adopts microbial treatment technology.
Project scale: The processing capacity of kitchen waste is 30t/d.
Project technology: The kitchen waste adopts microbial treatment technology.
Number:
Number of views:
1000
Keywords:
Number:
Processing scale: 90t/d
Leachate treatment process: process combination of low energy consumption evaporation (MVC) + ion exchange + ammonia recovery
Leachate treatment process: process combination of low energy consumption evaporation (MVC) + ion exchange + ammonia recovery
Number:
Number of views:
1000
Keywords:
Number:
Processing scale: 300,000 square meters of restoration site and surrounding land
Main pollutants: various heavy metals such as lead and zinc
Technical solution: hardening peeling + sealing barrier + chemical leaching + safe landfill disposal
Main pollutants: various heavy metals such as lead and zinc
Technical solution: hardening peeling + sealing barrier + chemical leaching + safe landfill disposal
Number:
Number of views:
1000
Keywords:
Number:
Project scale: the first-phase project is 100t/d, and the second-phase project is increased to 200t/d.
Treatment process: The physical and biological treatment process route of "mechanical sorting - industrial oil production - anaerobic fermentation to produce biogas".
Treatment process: The physical and biological treatment process route of "mechanical sorting - industrial oil production - anaerobic fermentation to produce biogas".
Number:
Number of views:
1000
Keywords:
Previous page
1
Next page
CNHOMELAND Environmental Co., Ltd All Rights Reserved
For the record: Powered by 300.cn SEO
Service hotline:
020-66840111