Office   Email     CN EN
CNHOMELAND
CNHOMELAND
CNHOMELAND
CNHOMELAND
CNHOMELAND
CNHOMELAND
Previous
Next
CNHOMELAND
Click to view all categories

Tel:020-66840111
Mail:haolanhuanbao2020@163.com
Add:Guangzhou huangpu district dashadong road no.319 baolizhongyu 22F

/
Case

Case

Number:
Guangzhou Science and Technology Plan Project

Project Name: Development and Demonstration of Remediation Technology for Cadmium/Lead Contaminated Farmland

Project introduction: The company and the South China Botanical Garden jointly developed heavy metal soil remediation technology, developed new passivation/stabilization materials and screened and cultivated the super-accumulating plant Amaranth for the remediation of farmland around the lead-zinc mine smelter in Renhua County.
Number:
Number of views:
1000
Keywords:
Number:
Guangzhou Science and Technology Plan Project

Project name: Development and application of heavy metal fixatives for contaminated soil

Project introduction: The company and the Guangdong Provincial Institute of Ecology and Soil Research jointly developed, using potted methods and field experiments to research heavy metal remediation agents in farmland soil, screen and optimize fixatives, study the mechanism and effect of soil fixatives, and develop formula soils Heavy metal fixative.
Number:
Number of views:
1000
Keywords:
Number:
Project Name: Research on Key Technologies for Fuel Ethanol Wastewater Treatment and Reuse

Project introduction: This project is independently invested by our company in research and development, mainly through two-stage anaerobic fermentation, biological denitrification, strong oxidation, ultrafiltration and reverse osmosis, etc., and finally produces reclaimed water that meets the "Design Specifications for Wastewater Recycling and Utilization Engineering". The system can be put into operation in fuel ethanol production enterprises, and the effluent can be used for process mixing water, circulating supplementary water, boiler supplementary water, etc., reducing the new water consumption of enterprises, saving water resources and production costs.
Number:
Number of views:
1000
Keywords:
Number:
Project Name: Research on the Application of Food Waste to Produce High-quality Feed and Safe Breeding
Number:
Number of views:
1000
Keywords:
Number:
Project Name: Research on Soil Remediation Engineering Technology of Heavy Metals and Organic Polluted Industrial Sites
Number:
Number of views:
1000
Keywords:
Number:
National Key R&D Program Special Project for Efficient Development and Utilization of Water Resources

Project Name: Research and Demonstration of Key Technologies for Rural Drinking Water and Sewage Treatment in Xinjiang Agricultural Reclamation Areas

Research and development content: This project is one of the subjects of the "13th Five-Year" national key research and development plan "Integration Technology and Application Demonstration of Rural Water Supply and Drainage in Typical Water Deficient Areas in Western China". The subject mainly focuses on technical research on issues such as sewage treatment and reuse in Xinjiang agricultural reclamation areas, as well as improving drinking water safety.

Implementation period: November 2016 to June 2020

Implementing units: Haolan Environmental Protection Co., Ltd., Shihezi University, Xinjiang Production and Construction Corps Environmental Monitoring Center Station, Nankai University, Huazhong University of Science and Technology and other 5 units are responsible for implementation.
Number:
Number of views:
1000
Keywords:
Number:
Project introduction: Xinfengjiang Reservoir has a total storage capacity of 13.9 billion cubic meters and an average annual water intake of 6.1 billion cubic meters. It is the largest artificial lake in South China among the seven major reservoirs in the country. At present, the ebb and flow zone is exposed, and the soil is peeled off layer by layer due to erosion by rain, resulting in serious soil erosion.

Goal of Governance: Through the pilot project of the first phase of the ecological protection and restoration project in the Xinfengjiang Reservoir Area, restore the ecosystem in the Reservoir area, reduce soil erosion, purify the water quality of the inflowing water, and enable the Xinfengjiang Reservoir. The ecological environment and water resources are effectively protected and sustainable and healthy development is possible.
Number:
Number of views:
1000
Keywords:
Number:
Shenzhen Shafu River Water Quality Improvement Service Project

Governance scale: The total length is 11.17 kilometers, and the watershed area is 16.62 square kilometers.

Technical route: sewage interception along the river + air flotation treatment + biochemical treatment + artificial oxygen.

Goal of treatment: When the sewage interception along the river in the comprehensive improvement project of Shafu River is completed, all indicators will reach the standard of better than mild black odor.
Number:
Number of views:
1000
Keywords:
Number:
The engineering scope of the Sanshui River Governance Project is three rivers in the Sanshui District: Da Mian Chung, Dalang Eddy Chung, and Zuoan Chung, with a total length of 47.77 kilometers.

Governance ideas: take pollution interception and control + ecological restoration + scientific management

Governance goal: the water quality reaches the national class IV water quality standard for surface water (GB3838--2002)
Number:
Number of views:
1000
Keywords:
Previous page
1
2
3
4
5
6

CNHOMELAND Environmental Co., Ltd  All Rights Reserved

For the record:    Powered by 300.cn  SEO

Service hotline:
020-66840111